Loading...

Proceedings of

6th International Conference on Advances in Civil, Structural and Environmental Engineering ACSEE 2017

"DISPUTE RESOLUTION APPROACHES FOR PUBLIC PROJECTS IN THE CONSTRUCTION INDUSTRY WITHIN GAUTENG PROVINCE"

NAZEEM ANSARY
DOI
10.15224/978-1-63248-139-9-56
Pages
82 - 87
Authors
1
ISBN
978-1-63248-139-9

Abstract: “this paper gives an understanding into the variables which affect upon the determination of dispute resolution strategies on a public projects in the construction industry in Gauteng Province of South Africa. The accompanying elements are utilized, for example, cost, speed, result, enforceability, protection and classification, open and reasonableness, control, adaptability inventive cures and connections. The dispute review board will be compared with alternative dispute resolution methods to demonstrate the differences and the impact it has on construction performance, primarily time, cost and quality. The Survey questionnaire were used to justify the relative importance of these factors in the selection of dispute resolution methods is examined and through one-on-one interviews, the efficiency of the current alternative dispute resolution methods operating in Gauteng construction industry is compared with the efficiency of the dispute review board. Concerns with respect to the utili”

Keywords: Dispute review board, alternative dispute resolution, Gauteng construction industry

Download PDF